Which states require a route survey?

A route survey is a physical drive of the route, measuring every bridge, wire and signal the load will pass under. Here is the height and width at which each state requires one.

Have a load in mind? See which permits, escorts and surveys it needs on your route → Free, no signup.

Updated November 2026 · Figures from FreightDeck's audit of 51 US jurisdictions and its monthly market-rate check

The table

46 of 51 states publish a route survey trigger. The most common height trigger is null (12 states) and the most common width trigger is null (22 states). The strictest: New Hampshire at 13 ft 6 in high, Massachusetts at 13 ft 8 in high, New York at 14 ft high.

StateSurvey above (height)Survey above (width)Superload lead time
Alabama16 ft16 ft~5 days
Alaska15 ftnull~5 days
Arkansasnullnull~5 days
California17 ftnull~30 days
Colorado17 ft 6 innull~14 days
Connecticut16 ft16 ft~5 days
Florida18 ft22 ft~10 days
Georgianullnull~15 days
Hawaiinull14 ft~21 days
Illinois16 ft16 ft~3 days
Indiana17 ft18 ft~7 days
Iowanullnull~5 days
Kansas16 ft14 ft~3 days
Kentucky15 ft 6 innull~5 days
Louisiananullnull~28 days
Mainenullnull~5 days
Maryland14 ft 6 innull~30 days
Massachusetts13 ft 8 in13 ft~7 days
Michigan15 ft16 ft~10 days
Minnesota16 ft20 ft~14 days
Mississippi15 ft 7 in17 ft~5 days
Missouri16 ft16 ft~10 days
Montana17 ft20 ft~5 days
Nebraska16 ftnull~10 days
Nevada18 ft20 ft~10 days
New Hampshire13 ft 6 innull~2 days
New Jersey14 ft 6 in16 ft~5 days
New Mexico15 ft 6 innull~5 days
New York14 ft16 ft~14 days
North Carolinanullnull~10 days
North Dakotanullnull~5 days
Oklahomanullnull~5 days
Oregon17 ft16 ft~10 days
Pennsylvania14 ft 6 in16 ft~15 days
Rhode Island14 ftnull~5 days
South Carolina16 ftnull~5 days
South Dakotanullnull~5 days
Tennessee15 ft16 ft~30 days
Texas18 ft 11 in20 ft~21 days
Utah18 ftnull~14 days
Vermont14 ft15 ft~10 days
Virginianullnull~10 days
Washington16 ft16 ft~30 days
West Virginianullnull~2 days
Wisconsin19 ft22 ft~5 days
Wyoming17 ft18 ft~3 days

Arizona, Delaware, Idaho, Ohio, District of Columbia publish no fixed trigger and require surveys case by case with the permit. Several states also require a survey for any superload regardless of dimension. A load over the trigger in any one state on the route needs a survey for that state's miles.

What the survey changes

  • Lead time. The survey has to be done before the permit is issued, and it takes a day or two of driving plus a report. It is the long pole on a superload schedule. Permit lead times by state →
  • Route. The surveyor often finds the obstruction that forces a detour, an escort change or a utility lift. That is the point: better on paper than under a wire.
  • Cost. Surveys are priced flat or per mile depending on the state and the surveyor. What a route survey costs →

Price the whole move, not just the permit

FreightDeck estimates permits, escorts, police, route surveys, engineering and the truck rate for your exact load and route, across 50 states and Canada.

Price a load free → See plans & pricing →

Questions

Which states require a route survey?

46 states, once a load exceeds a height (most often null) or width (most often null) trigger. See the table for each state.

Who does a route survey?

Usually the pilot car company or a dedicated survey firm, driving the exact permitted route with a height pole and recording every clearance.